Floored!

DSC_0491

Here is that area on the RH inner tunnel side that was a little persnickety in the alignment phase. After we were able to hammer over this tab on the new floors, that holds it into place – but is not something we wanted to do in the alignment phase or you can’t get the floor back out! The tunnel was a little messy and thin on it’s bottom flange, so we just ran a nice, strong bead along the whole thing.

Bookmark the permalink.