Starting the sills and floors

DSC_0139

The inner surfaces of the B-post were then hand-sanded, and coated with red oxide. The LH floor and inner sill are now also ready to be attached. The next blog entry will show the installation of a “hidden subframe” – stay tuned!

Bookmark the permalink.